19898. |
18-Apr-2024 10:00 AM |
30-May-2024 05:00 PM |
01-Jun-2024 11:00 AM |
Planning, Design, Engineering, Construction, Fabrication, Erection, Supply, Installation, Testing, Trial Run and Commissioning of CHP consisting of RCC Silo ..... at Rampur Batura OCP (4.0Mtpa) of Sohagpur Area, with DLP Period of 05 years./GM(C)/SECL/BSP/e-T_TK /SGP/2024-25/05 dtd.16.04.2024/2024_SECL_306673_1 |
South Eastern Coalfields Limited |
|